Glossary · also called Goods Receipt Note, Goods received note, Material receipt note, MRN

What is a GRN (Goods Receipt Note)?

GRN: A GRN (goods receipt note) is the document a business creates when it receives material from a supplier. It records what arrived against the purchase order — item, quantity, condition and date — and is the point at which stock increases and the business accepts the goods, making it one leg of the three-way match before the supplier is paid.

Definition

A purchase order says what you asked for. The supplier’s invoice or delivery challan says what they claim to have sent. The GRN says what you actually received. It is created by stores, or on a construction site by the store keeper, after counting and checking the delivery.

A GRN usually records the PO reference, supplier, challan or invoice number, items, quantities ordered, received and accepted, any rejected quantity with reasons, and the receiving location.

How it works

An example, with illustrative numbers only:

Item PO qty Challan qty Received Accepted Remark
MCCB 250 A 4P 10 10 10 10 —
Contactor 32 A 40 40 38 36 2 short, 2 damaged
Cement OPC 53 200 bags 200 200 195 5 bags set

Only accepted quantities should go into stock. The shortages and rejections feed the three-way match: the supplier’s invoice should be settled for what was accepted, not what was claimed. On a construction project, the GRN is also the point at which committed cost becomes actual cost in the cost ledger.

Common mistakes

  • Stock entered without a GRN, so nobody can trace how it arrived.
  • Copying the challan quantity instead of counting.
  • GRNs raised days later, after material has already been issued.
  • No link to the PO, which makes invoice matching manual.
  • Accepting goods without checking specification — rating, make or grade — as well as quantity. A wrong item counted correctly is still a wrong item.

In Zaptiz

In Zaptiz Electrical, confirming a GRN is the single, auditable way stock enters, and supplier invoices are matched across PO, GRN and invoice. In Zaptiz Construction, posting a GRN updates stock and PO receipts and moves committed cost into inventory. In both, an AI reader can match a supplier invoice or challan to the PO and prepare a draft GRN with differences flagged — a person confirms it.

All glossary terms

Electrical ERP

Zaptiz Electrical

For electrical panel manufacturers and panel builders — enquiry, BOM and quotation through purchase, production, dispatch and GST invoicing.

Construction ERP

Zaptiz Construction

For construction contractors — BOQ and tenders through project budgets, procurement, site progress, RA bills and payments.

Team performance

Zaptiz WorkHub

For any team — tasks and approvals, KPIs, attendance, standups, rewards and leaderboards, with an AI assistant.

Ready to modernise your business?

Whether you build electrical panels or deliver construction projects, Zaptiz brings your operations together on one platform.