Security
Security you can understand
Here is what Zaptiz actually does to protect your account, your records and your payments — stated plainly, without certification badges we don’t hold.
-
Strong sign-in
Email verification codes at sign-up, sign-in alerts on every login, account lockout after repeated failures, and sign-in with Google or Zoho.
-
Two-factor authentication
Authenticator-app (TOTP) codes with backup codes on both products, with lockout after repeated wrong codes.
-
Secure sessions
HttpOnly, Secure cookies instead of tokens in the browser, short-lived access with refresh, and one active session per user — a new login signs out the old one.
-
Role-based access
Every API endpoint checks the user’s role. Construction adds project-team access, financial visibility per member and maker-checker rules.
-
Company data isolation
Every query is scoped to your company. Zaptiz Construction runs on its own database, separate from Zaptiz Electrical.
-
Protected APIs
Rate limits on sign-in, AI and payment endpoints, IP blocking, and a prompt firewall that screens every AI request.
-
Payment safety
Payments run on your own Razorpay or Stripe account. Gateway secrets are encrypted, webhooks are signature-verified and replays are rejected.
-
Audit trail
Security, user and payment events are logged; Construction keeps an append-only audit trail for every change and asks for reasons on sensitive actions.
-
Cloud infrastructure
Hosted on Microsoft Azure in Central India over TLS, with private file storage, time-limited download links and nightly database backups.
Shared responsibility
Your part matters too
- 01Turn on two-factor authentication for every user — especially admins.
- 02Give people the narrowest role that lets them do their job.
- 03Remove or deactivate users as soon as they leave.
- 04Connect payment gateways, Brevo and WhatsApp with keys used only for Zaptiz.
- 05Review AI drafts before confirming them, just as you would a colleague’s work.
Report a security issue
If you believe you have found a vulnerability in Zaptiz, please report it privately so we can fix it before it is disclosed. Include steps to reproduce and any relevant URLs.
support@zaptiz.comFor data-protection requests — access, correction or deletion — write to privacy@zaptiz.com. See our Privacy Policy.
Ready to modernise your business?
Whether you build electrical panels or deliver construction projects, Zaptiz brings your operations together on one platform.