Guides
Learn Zaptiz, one workflow at a time
Practical walkthroughs of the most common jobs in each product. For full reference material, see the documentation.
Product documentation- Zaptiz Electrical
Getting started with Zaptiz Electrical: sign-up, trial, onboarding and your first quotation
Set up Zaptiz Electrical step by step: create your account, start the 9-day free trial, finish the onboarding wizard and send your first GST quotation.
Getting started · 4 min read
- Zaptiz Electrical
Drawing or photo to BOM to quotation in Zaptiz Electrical
Use Zaptiz Electrical's AI drawing and photo analysis to draft a panel BOM, review flagged lines, and turn the confirmed BOM into a GST quotation.
Intermediate · 4 min read
- Zaptiz Electrical
Purchase to stock in Zaptiz Electrical: requisition, PO, GRN and supplier invoice match
Run purchasing in Zaptiz Electrical: raise requisitions from shortages, convert to POs by vendor, receive stock with a GRN and 3-way match supplier invoices.
Intermediate · 4 min read
- Zaptiz Construction
Setting up your first project in Zaptiz Construction
From registration to contract award in Zaptiz Construction: verify your email, complete the setup wizard, add a client, import a BOQ, quote and award.
Getting started · 4 min read
- Zaptiz Construction
How to prepare an RA bill: format, worked example and deductions
How to prepare a running account (RA) bill step by step: cumulative measurement, the standard format, retention, advance recovery, LD, TDS and GST on gross.
Getting started · 4 min read
- Zaptiz Construction
Running RA bills in Zaptiz Construction: measurement, certification, deductions and invoice
Prepare RA bills in Zaptiz Construction: cumulative measurement, the over-billing guard, client certification, deductions, retention and the GST invoice.
Intermediate · 5 min read
- Both products
Using AI agents safely in Zaptiz: drafts, approvals, credits and what each product offers
How AI agents work in Zaptiz Electrical and Zaptiz Construction: drafts you confirm, role-limited answers, AI credits, auto-send settings and the agents available.
Advanced · 4 min read