Guide · Both products 4 min read
Using AI agents safely in Zaptiz: drafts, approvals, credits and what each product offers
How AI agents work in Zaptiz Electrical and Zaptiz Construction: drafts you confirm, role-limited answers, AI credits, auto-send settings and the agents available.
Zaptiz uses AI inside everyday workflows: reading drawings and supplier documents, drafting BOMs, BOQs, purchase orders, goods receipts and bills, and answering questions about your own data. This guide explains the rules every agent follows, how AI credits work, and what is available in Zaptiz Electrical and Zaptiz Construction, so you can switch agents on with confidence.
The ground rules
1. Agents draft, people confirm
Agents prepare quotations, purchase orders, goods receipts and bills as drafts. A person reviews and confirms before anything is created, sent or posted. Treat every draft as work prepared by a capable new colleague: usually right, always worth checking.
2. The AI sees only what you can see
The assistant answers as the signed-in user, inside your company, limited by your role. In Zaptiz Construction it is also limited by project access, and financial figures stay hidden from people who are not allowed to see them.
3. Numbers come from your records
Figures come from the ERP itself; the AI writes the explanation. Construction briefings drop any sentence that quotes a number they were not given.
4. Auto-send is off by default
Where an agent can send messages on its own, such as payment reminders, automatic sending is off by default and must be switched on by an admin.
5. Usage is metered and logged
AI usage is metered in credits, with per-user rate limits, and every call is logged. Cost stays predictable and you can see where credits go.
Agent modes
Each agent works in one of four modes.
| Mode | What it does | Your action |
|---|---|---|
| Drafts for approval | Prepares a record | Review, correct, confirm |
| Report | Summarises or checks | Read and decide |
| Advisory | Ranks or recommends | Use it to inform a decision |
| Guard | Screens for misuse | Review proposed actions |
AI credits
Zaptiz Electrical
| Plan | AI credits included |
|---|---|
| Free trial (9 days) | 10,000 |
| Business | 1,50,000 |
| Pro | 3,00,000 |
| Enterprise | 7,50,000+ |
If you need more, top-up packs are available: 10,000 credits for ₹999, 25,000 for ₹2,249, 60,000 for ₹4,999 and 1,50,000 for ₹11,249. Plans and top-ups are listed on the pricing page.
Zaptiz Construction
AI credits are sized to your company as part of your plan. Contact sales to discuss capacity.
Agents in Zaptiz Electrical
| Agent | What it does | Mode |
|---|---|---|
| Quotation Drafting | Enquiry to costed draft BOM and quotation | Drafts for approval |
| CRM Follow-up | Escalating follow-ups for quiet leads | Drafts for approval |
| Smart Procurement | Shortages to purchases from the cheapest vendor | Drafts for approval |
| Invoice and Delivery Reader | Reads supplier documents, matches the PO, drafts the GRN | Drafts for approval |
| Collections | Overdue reminders with a Pay-Now link by email or WhatsApp | Drafts for approval |
| Price-List Intelligence | Imports supplier price lists after review | Drafts for approval |
| Production Planner | Ranks open jobs, flags late or material-blocked ones | Advisory |
| GST Agent | Computes and checks GSTR-1/3B with a filing calendar | Report |
| Daily Briefing | The owner’s morning summary by email and push | Report |
| Ask-Your-Data | Charts and answers from your data in chat | Report |
| Security Sentinel | Screens AI prompts, proposes account or IP actions | Guard |
Electrical also offers AI drawing analysis for PDF and image drawings (not DWG or DXF), photo analysis with brand-tier pricing, and an in-app support desk where AI answers first and hands over to a person in the same thread.
Agents in Zaptiz Construction
| Agent | What it does | Mode |
|---|---|---|
| Daily Site Briefing | Per-role morning brief | Report |
| BOQ Generator | Scope text or messy Excel/PDF into an unpriced draft BOQ | Drafts for approval |
| Rate Suggestion | Fills blank rate-analysis coefficients, library first | Drafts for approval |
| Resource Catalog Match | Suggests catalogue links for unlinked BOQ lines | Advisory |
| Procurement Agent | Approved-but-unordered material into draft POs per vendor | Drafts for approval |
| Invoice and Challan Reader | Photo or PDF matched to the PO, draft GRN with differences | Drafts for approval |
| RA Bill Drafting | Next bill’s quantities with the over-billing check | Drafts for approval |
| Cost Overrun Watch | Variance drivers and forecast by project | Report |
| Labour and Plant Productivity | Man-days against norms, idle plant, repeat breakdowns | Report |
| Collections Agent | Overdue invoices by client with reminder text drafted | Report |
| GST and TDS Agent | Monthly output GST and TDS checks plus a filing calendar | Report |
Coming soon: Tender and Contract Analyser, DPR Summariser, Quality, Snag and Safety Watch, Cash-flow Forecast, and Schedule and Delay Risk.
The Construction assistant can currently draft material requests, purchase orders from material requests and change-order headers. Otherwise it answers questions from your data.
What the GST agents do not do
Both GST agents prepare figures, run checks and keep a filing calendar. They never file returns on your behalf, and Zaptiz does not generate e-invoices (IRN) or e-way bills today. Filing remains with you or your CA.
A safe rollout plan
- Start with report agents, such as the daily briefing and GST checks. They build trust in the data without changing records.
- Clean your masters: products, vendors, price lists, BOQ items. Agents working on messy data draft messy records.
- Switch on one drafting agent where preparation takes the most time, often procurement or document reading.
- Review every draft for the first few weeks. Note where corrections are needed.
- Assign confirmations by role. Purchase managers confirm POs, stores confirm GRNs, QS confirms RA bills.
- Consider auto-send last, and only for low-risk messages such as reminders.
- Watch credit usage and set expectations with heavy users.
Next steps
- See the full AI overview on the AI page.
- Read the reasoning in AI agents that draft, people who decide.
- Product reference for each agent is on Docs.
- Review security controls, including prompt screening, on the security page.
Try it in Zaptiz
Electrical ERP
Zaptiz ElectricalFor electrical panel manufacturers and panel builders — enquiry, BOM and quotation through purchase, production, dispatch and GST invoicing.
Construction ERP
Zaptiz ConstructionFor construction contractors — BOQ and tenders through project budgets, procurement, site progress, RA bills and payments.