Glossary · also called Motor Control Centre, Motor control center, MCC
MCC Panel: Meaning, Components, HSN Code and BOM
MCC panel: An MCC panel (motor control centre) is a low-voltage switchgear assembly that houses the starters, protection and controls for a group of electric motors in one place, fed from a common busbar through an incomer. Each motor has its own feeder, typically with a breaker, contactor and overload relay, or a soft starter or VFD.
Definition
Factories, water and sewage plants, HVAC systems and process lines run many motors — pumps, fans, compressors, conveyors. Rather than scatter a starter next to each motor, an MCC brings them together in one panel with a shared incomer and busbar. That makes operation, maintenance and protection simpler.
An MCC is often fed from a power control centre (PCC), which distributes power to MCCs and distribution boards. MCCs can be fixed-type, where feeders are wired in permanently, or draw-out, where feeder modules can be withdrawn for maintenance. Low-voltage assemblies in India are generally designed and tested to IS/IEC 61439, which also defines the forms of internal separation between feeders.
MCC vs PCC panel
| MCC (motor control centre) | PCC (power control centre) | |
|---|---|---|
| Job | Starts, stops and protects motors | Receives power from the transformer or DG and distributes it |
| Outgoing feeders | Motor starters (DOL, star-delta, soft starter, VFD) | Breakers feeding MCCs, distribution boards and large loads |
| Typical devices | MPCB or MCCB, contactors, overload relays, VFDs | ACBs and large MCCBs, metering, often bus couplers |
| Position | Downstream, near the motors it serves | Upstream, near the transformer |
Many plants have one PCC feeding several MCCs. Smaller sites sometimes combine both in one “PMCC” panel.
How it works
An illustrative MCC for a small pumping station:
- Incomer: one ACB or MCCB with metering and protection.
- Busbar: copper or aluminium, sized for the total load and fault level.
- Feeders, for example:
- 4 × DOL starters for 7.5 kW pumps (MPCB or MCCB, contactor, overload relay).
- 2 × star-delta starters for 37 kW pumps (three contactors, timer, overload relay).
- 1 × VFD feeder for a 55 kW pump.
- Control: control transformer, selector switches, push buttons, indication lamps, terminals.
- Enclosure: sheet-steel cubicles with cable alleys and gland plates.
Every feeder becomes a group of lines in the BOM. Starter type, motor rating and brand drive most of the cost. Plants with many motors often add an APFC panel to correct power factor.
Common mistakes
- Sizing starters on kW alone without checking duty, starting method and coordination with the protective device.
- Missing feeder accessories — CTs, ammeters, interlocks — when building the BOM from a drawing.
- Underestimating fabrication and wiring labour, which grows with feeder count.
- Not quoting spare feeders that the customer’s drawing shows but does not detail.
MCC panel HSN code
MCC panels are generally classified under HSN heading 8537: boards, panels and cabinets equipped with two or more switching or protective devices, for electric control or the distribution of electricity.
- 8537 10: for a voltage not exceeding 1,000 V. Most low-voltage MCCs fall here.
- 8537 20: for a voltage exceeding 1,000 V.
Use the full 8-digit code your tax advisor confirms for your exact product, and check the current GST rate for it. Loose components you sell separately, such as contactors or breakers, carry their own HSN codes. The panel code doesn’t cover them.
In Zaptiz
Zaptiz Electrical includes an MCC template in its BOM Generator, with brand tiers, charges and margin. The drawing analyser reads PDF or image MCC drawings and marks each line matched, needs review or no match against your catalogue for you to confirm. See MCC and PCC panel software and panel BOM software for the full drawing-to-quotation flow.