Use case

Software for MCC, PCC and APFC panel manufacturers

Zaptiz Electrical helps MCC, PCC and APFC panel builders go from enquiry to quotation faster: build the BOM from a template, a drawing or a plain description, price it across brand tiers, add fabrication and wiring charges, and turn it into a GST quotation and sales order.

Why MCC and PCC quotations take so long

An MCC panel can carry dozens of motor feeders, each with its own breaker, contactor, overload relay or drive. A PCC adds air circuit breakers, metering and bus couplers on top. Quoting one by hand means:

  • Reading the single-line diagram feeder by feeder and typing each device into Excel.
  • Looking up prices across several brands and supplier lists that are already out of date.
  • Guessing fabrication, wiring and testing charges.
  • Doing it again when the customer asks for a different make.

Many enquiries are lost not on price but on response time. The shop that quotes first, accurately, usually gets the first conversation.

MCC vs PCC, in one line each

  • MCC (motor control centre) starts, stops and protects motors. Its outgoing feeders are starters: DOL, star-delta, soft starter or VFD.
  • PCC (power control centre) receives power from the transformer or DG and distributes it to MCCs, distribution boards and large loads, usually through ACBs and large MCCBs.

The full comparison is on the MCC panel page, and the power factor side is covered under APFC panel.

What MCC and PCC panel software should do

  • Start from a template for common panel types, so a standard MCC isn’t rebuilt from nothing.
  • Read a drawing, because most enquiries arrive as an SLD.
  • Match real products in your own catalogue, with a review step for anything uncertain.
  • Price in more than one brand, so you can meet a target price.
  • Add charges and margin transparently: fabrication, wiring, labour, testing.
  • Carry the BOM into the quotation, sales order and purchase without re-typing.

How Zaptiz Electrical builds MCC, PCC and APFC panel BOMs

Three ways to build the BOM

Method Best for AI credits
Spec Form Standard panels: pick the MCC, APFC, VFD, AMF, Distribution Board, Lighting or Control template and fill in incomer, feeders, busbar and enclosure Free
Describe Anything else, including PCCs: type the panel in plain English Metered
Upload Drawing An SLD or panel layout drawing as an image; the AI reads its components Metered

Whichever method you use, every line is matched to a real product in your catalogue. Unmatched components become flagged ₹0 lines, and an amber banner warns that the total is understated until you price them.

Brand tiers

Before generating, pick a Low, Mid or Premium tier. Each tier maps to a different class of brands that you define, so the same MCC can be quoted three ways without rebuilding it. For an existing panel, the photo analyser prices every detected component across all three tiers.

Charges, margin and costing

Each BOM has a Charges & Margin block for labour, fabrication, wiring and testing, with a margin percentage on top:

Grand total = (material + charges) × (1 + margin %)

For a fuller estimate, Auto Costing adds sheet-metal fabrication, powder coating, internal wiring, labour and overhead, with a numbered calculation trace. Give it the enclosure dimensions and the calculation is deterministic and uses no AI credits.

From BOM to quotation and order

Approve the BOM, then create a quotation from it for a customer: the material lines plus labour, fabrication, wiring, testing and margin lines are carried across. Confirm the quotation and convert it to a sales order. If the design changes, create a new version of the BOM instead of overwriting the one you quoted. Every saved BOM also becomes a reusable panel template.

For pricing and quotation detail, see panel quotation and costing software. For the drawing-to-BOM flow step by step, read the guide Drawing or photo to BOM to quotation.

Limits worth knowing

  • There is no PCC-specific template. Use Describe or Upload Drawing, then save the result as your own template.
  • The drawing upload in the BOM Generator takes images (JPG, PNG, WebP). Use the single-line diagram or layout drawing, not a photo of a finished panel; photos go to the photo analyser.
  • AI output is a draft. Lines that need review are never attached automatically.

Get started

The quickest test is a real enquiry: build one MCC from the Spec Form, then the same panel in a second brand tier, and compare. Start a free trial, read the BOM Generator docs, or book a demo to see it with your own drawing.

Questions about mcc panel manufacturing software

Is there a ready template for MCC panels?

Yes. The BOM Generator's Spec Form has templates for Distribution Board, MCC, APFC, Lighting, Control, VFD and AMF panels. You fill in the incomer, feeders, busbar and enclosure, and the BOM is derived from the template. The Spec Form uses no AI credits.

What about PCC panels?

There is no dedicated PCC template. Build a PCC BOM by describing it in plain English, for example an incomer ACB with several outgoing MCCB feeders, or by uploading its single-line diagram. Once saved, any BOM can be reused as a panel template for the next similar job.

Can it read an MCC single-line diagram?

Yes. Upload the SLD or panel layout drawing as an image and the AI lists the components it finds, matched against your product catalogue. Lines that need review or have no match are flagged, never silently dropped, and a component with no price stays as a flagged ₹0 line until you price it.

Can I quote the same MCC in different brands?

Yes. Choose a Low, Mid or Premium budget tier before generating. Each tier matches a genuinely different class of brands, which you configure, so you can offer a customer options at different price points from one specification.

Ready to modernise your business?

Whether you build electrical panels or deliver construction projects, Zaptiz brings your operations together on one platform.