Use case

ERP for electrical panel builders, from enquiry to dispatched panel

Zaptiz Electrical is an ERP for electrical panel manufacturers that connects leads, BOMs and quotations, purchase and stores, shop-floor work orders, QC, dispatch, GST invoicing and payments — in the order a panel shop actually works.

The problem: every panel is a small project

An electrical panel shop does not sell from a catalogue. A customer sends a single-line diagram, a GA drawing or a photo of an old panel, and expects a price in days. Then the order has to be engineered, bought, built, tested and delivered — usually against a deadline set by someone else’s project.

In most panel shops this runs across disconnected tools:

  • BOMs and costing in Excel, rebuilt for each enquiry.
  • Supplier price lists as PDFs in someone’s inbox, out of date by the time they are used.
  • Purchase raised from memory of what the job needs.
  • Job status tracked on a whiteboard or a WhatsApp group.
  • Invoicing and GST in an accounting package that knows nothing about the job.

The result is slow quotes, missed components, material bought twice and margins nobody can confirm. We have written about why this happens in Why generic ERPs fail electrical panel manufacturers.

How the panel business works

Whether you build distribution boards, MCC panels, APFC panels, VFD panels or PCC and AMF panels, the flow is similar:

  1. Enquiry with a drawing, specification or photo.
  2. Estimation — a BOM of switchgear, enclosures, busbar, cabling and accessories, priced from current supplier rates in the brand the customer wants.
  3. Quotation with GST, often revised several times.
  4. Order — the accepted quotation becomes a sales order.
  5. Material — check stock, raise requisitions for shortages, place POs and receive goods.
  6. Production — fabrication, assembly and wiring against a work order.
  7. Testing and QC before dispatch.
  8. Dispatch and invoice — delivery note, GST tax invoice and collection.

What to look for in panel builder ERP

  • BOM templates for panel types, with brand tiers, charges and margin.
  • Help reading drawings and specs, without trusting AI blindly.
  • Current supplier prices that are easy to import and update.
  • Sales orders that drive material: shortages straight to requisitions.
  • Purchase discipline — PO approval, goods receipt and a three-way match before paying suppliers.
  • Job tracking on the floor, with QC that actually blocks dispatch.
  • GST invoicing with HSN, correct CGST/SGST or IGST and clean numbering.

Questions to ask in a demo

  • Show me a quotation built from one of my own drawings. Which lines did the system get wrong, and how did it tell me?
  • When a supplier’s price list changes, how do I update a few hundred prices without editing them one at a time?
  • An order is confirmed. How do I see which components are short and raise purchases for them?
  • Can a panel be dispatched before QC passes?
  • What happens to the invoice number sequence when two people raise invoices at the same time?

How Zaptiz Electrical runs a panel shop

Zaptiz Electrical is built around that flow.

Leads and quotations

A drag-and-drop lead pipeline with custom stages, win probability and a weighted forecast. Each lead has a workspace holding its timeline, tasks, drawings, BOMs and quotations. My Day lists overdue and upcoming follow-ups and deals with no next step.

BOMs from drawings, photos or text

The BOM Generator has templates for DB, MCC, APFC, VFD, AMF and other panels, with brand tiers, charges and margin. The drawing analyser reads PDF and image drawings and marks every line matched, needs review or no match — you confirm. Photo analysis turns a picture of an existing panel into a component list priced across low, mid and premium tiers. Panel Design Studio lets you trace and measure on a drawing and count components with AI detection. See Panel BOM software for more detail.

Quotations and price lists

Quotations carry per-line GST and discounts, a missing-price guard that warns about ₹0 lines, and 12 print layouts; send them by print, email or WhatsApp and convert to a sales order. Supplier price lists can be imported from PDF, Excel or a photo, and prices bulk-edited with a dry-run preview.

Purchase and stores

Sales orders show material readiness and send shortages to requisitions. Requisitions carry a supplier per line and convert to POs by vendor. Confirming a GRN is the single, auditable way stock enters. Supplier invoices are matched across PO, GRN and invoice. Inventory supports multiple warehouses, reservations against jobs, transfers and reorder levels. The guide Purchase to stock in Zaptiz Electrical walks through it.

Production, QC and dispatch

Jobs are created from sales orders with a BOM, and work orders follow automatically, with material issue. A shop-floor board shows live job status, with job cards for printing. The QC checklist records pass, fail and rework, and dispatch is blocked until QC passes. Delivery notes carry transport details and the invoice can be raised straight from the delivery.

Finance

GST invoices with CGST/SGST/IGST and HSN, gap-free numbering per financial year, proforma invoices, Pay-Now links through your own Razorpay or Stripe, TDS/TCS on sales invoices, receivables ageing, and P&L, balance sheet, cash flow and trial balance.

What it does not do

No DWG/DXF reading, no Tally connector, no e-invoice (IRN) or e-way bill generation, and no batch or serial-number tracking.

Get started

Start the 9-day free trial — no card needed — and build one real quotation from a recent enquiry. Book a demo for a walkthrough, or compare plans on the pricing page.

Questions about erp for panel builders

Why do panel builders need an industry-specific ERP?

Panel work is engineer-to-order. Every job starts from a drawing or specification, needs a BOM before it can be priced, and is built against a sales order with its own material. Generic ERPs are designed for repeat products and stock items, so panel shops end up keeping BOMs, quotations and job tracking in spreadsheets outside the system.

Which panel types can Zaptiz Electrical estimate?

The BOM Generator has templates for common panel types including DB, MCC, APFC, VFD and AMF panels, with brand tiers, charges and margin. You can also build a BOM from a drawing, a photo of an existing panel or a plain-English specification.

Can Zaptiz Electrical read AutoCAD DWG files?

No. The drawing analyser reads PDF and image drawings. If your drawings are in DWG or DXF, export them to PDF first. Every line the AI finds is marked matched, needs review or no match against your catalogue, and you confirm before it becomes a BOM.

How much does Zaptiz Electrical cost?

There is a 9-day free trial with no card needed. After that, Business is ₹9,999 per month for up to 25 users and Pro is ₹14,999 per month for up to 60 users, both excluding GST. Enterprise is custom, from ₹29,999 per month.

Does it connect to Tally?

Not at present. A Tally connector is on the roadmap. Zaptiz Electrical can push customers, vendors, items, invoices and purchase orders to Zoho Books, and its own financial reports include P&L, balance sheet, cash flow and trial balance.

  • Panel BOM software that turns drawings, photos and specs into priced BOMs

    Zaptiz Electrical builds electrical panel BOMs from templates, PDF or image drawings, photos of existing panels or a plain-English spec, prices them from your imported supplier price lists across brand tiers, and turns them into GST quotations.

  • GST invoicing inside your ERP, not bolted on after it

    Zaptiz raises GST invoices from the work itself — a delivery or sales order in Zaptiz Electrical, a certified RA bill in Zaptiz Construction — with the right tax split, numbering, TDS and pay links, and an agent that checks GSTR-1 and GSTR-3B figures.

  • Software for MCC, PCC and APFC panel manufacturers

    Zaptiz Electrical helps MCC, PCC and APFC panel builders go from enquiry to quotation faster: build the BOM from a template, a drawing or a plain description, price it across brand tiers, add fabrication and wiring charges, and turn it into a GST quotation and sales order.

Ready to modernise your business?

Whether you build electrical panels or deliver construction projects, Zaptiz brings your operations together on one platform.