Use case

Quotation and costing software for electrical panel manufacturers

Zaptiz Electrical turns a customer enquiry, whether text, a panel photo or a drawing, into a costed draft quotation, shows exactly how the price was built, and carries the confirmed quote into a sales order.

Why panel quoting is a bottleneck

For a panel builder, the quotation is where the order is won or lost. The work behind it is heavy:

  • The enquiry arrives as an email, a WhatsApp photo or a drawing, never in a standard format.
  • Someone has to turn it into a BOM, price every line, and add fabrication, wiring and labour.
  • Margins are applied inconsistently, so two estimators price the same panel differently.
  • Nobody can later explain how a price was built when the customer pushes back.

A quote that takes three days often arrives after a competitor’s.

What to look for in panel quotation software

  • Accepts the enquiry as it comes: text, photo or drawing.
  • Builds the BOM from your own catalogue, with brand choices.
  • Costs transparently: components, fabrication, wiring, labour, overhead and margin, with a trace you can show.
  • GST per line, from the product’s own rate.
  • Guards against mistakes, such as lines still at ₹0.
  • Converts to a sales order without re-typing.

How Zaptiz Electrical quotes panels

Quote Studio: enquiry to draft quote

Capture the enquiry as text (for example “4P 100A MCCB incomer, 8-way distribution, 8× 32A MCB outgoing, IP54 enclosure”), a panel photo, or a drawing from the Drawing Manager. Add drafting hints such as preferred brand, margin and enclosure dimensions, and record where the enquiry came from: email, WhatsApp, phone, website, walk-in or referral.

Click Draft quotation and the Quotation Drafting Agent:

  1. Extracts the components from the text, photo or drawing.
  2. Builds a draft BOM matched to real products in your catalogue.
  3. Costs it: components, fabrication, wiring, labour, overhead and your margin.
  4. Creates a draft quotation with product lines plus labour, fabrication, wiring, testing and margin lines.

It never sends anything on its own. Drafts land in Quotation Drafts for an estimator to review.

Costing you can defend

Auto Costing turns any saved BOM into a selling price and shows each step:

Component cost → sheet-metal fabrication → powder coating → internal wiring → labour → overhead → total manufacturing cost → profit → selling price

Every figure comes with a numbered calculation trace. Enter the enclosure dimensions (for example 800×600×250 mm) and the whole calculation is deterministic, with no AI credits used. Leave them blank and the AI estimates wiring and labour, with a caveat on the result.

On the BOM itself, the Charges & Margin block holds labour, fabrication, wiring, testing and margin. Those values flow into any quotation created from the BOM.

The quotation itself

  • Pick products from the catalogue and the description, unit price and GST rate fill in automatically.
  • Set quantity, unit price, discount and GST per line, plus an overall discount and validity date.
  • Print or email the quotation with your own templates. Emailing marks it Sent.
  • Confirm it, then Convert to SO: a sales order is created with every line copied.
  • Once a quotation leaves draft, its lines are read-only. Changes go into a new version.

Brand options

Choose a Low, Mid or Premium brand tier when building the BOM, so you can offer the same panel at different price points. For MCC, PCC and APFC panels specifically, see MCC and PCC panel software.

Limits worth knowing

  • Quote Studio needs both the CRM and AI Suite modules switched on.
  • Auto Costing is a calculator: it doesn’t save results to the BOM or create a quotation. Use the BOM’s Charges & Margin block to keep the pricing.
  • Quote Studio’s default margin is 25% and Auto Costing’s is 18%. Set the margin explicitly if it matters.

Get started

Take a real enquiry from last week, paste it into Quote Studio, and compare the draft with the quote you actually sent. Start a free trial, read the Quote Studio docs, or book a demo.

Questions about electrical panel quotation software

Can Zaptiz draft a panel quotation from a customer's enquiry?

Yes. In Quote Studio you capture the enquiry as text, a panel photo or a drawing, and the Quotation Drafting Agent extracts the components, builds a BOM matched to your catalogue, costs it and creates a draft quotation. It never sends anything on its own; you review, edit and send.

How is the panel cost calculated?

Auto Costing adds sheet-metal fabrication, powder coating, internal wiring, labour and overhead to the component cost, then applies your margin, and shows a numbered calculation trace for every step. With enclosure dimensions entered, the calculation is deterministic and uses no AI credits.

What stops me sending a quote with missing prices?

Components with no price stay as flagged ₹0 lines, and a missing-price guard warns you before you print or email a quotation that still has them.

What happens after the customer accepts?

Confirm the quotation and convert it to a sales order, which copies every line. Once a quotation leaves draft its lines are read-only, so price changes go into a new version rather than silently altering what the customer saw.

Ready to modernise your business?

Whether you build electrical panels or deliver construction projects, Zaptiz brings your operations together on one platform.